295 cherub model

I started the setup for the cherub to get the original 4″ depth back again.

The new rubber positive has been laid on 4″ thick foam board and the clay built up aound the perimeter. I have it roughed out for now, to-morrow I’ll finish texturing and cleaning up the clay part and I can start pouring the 4 side sections to start with then. There’s virtually no undercuts on the design at all, so the face/front can be done in one large plaster mold section, 5 sections total.

Sept 7

One more section to pour left to go on this- the large “base” that can be done in one piece since there are no undercuts to deal with, and the 4 side sections will all sit on top of the “base” section when I get that done later tonight.

Image may contain: 1 person, food
Sept 8
The mold is done, now to dry it out

 

Comments are closed.