I haven’t worked on this much this last week as I’m on vacation from work, and I also spent a couple or three days repointing the brickwork on my gallery building, but it’s making progress. The puttis’ hands were not easy, I worked on those and his face yesterday, and today mostly two of the lion’s paws that were only roughed out.
-
-
Re-pointing the gallery facade
I finally had time this week to set about repointing the brick on my gallery building, the weather was just perfect, warm, nice breeze, low humidity and sunny. I had to rust treat the exposed steel I beam flange, prime and paint it first, then I began work on the mortar repointing. It’s just another of those periodic kinds of maintenance things I have to stop work on other projects to do.
Most of the facade is good, it was just a couple of courses of brick all the way across where the mortar was like sugar an inch in, obviously that had been repointed very poorly.
After I finished repointing I needed to caulk some gaps between the steel flange and the lowest course of brick and it’s done.
Here’s some pictures during work: